Business financial model file

Machine Shop Financial Model

Separate machine-shop installation cash from metal, spindle time and operator hours before pricing completed job volume.

Concept illustration for Machine Shop: A precision metal shop corner with a closed guarded CNC machine, metal components, tool holders and unmarked calipers on a workbench.

Opening investment and working cash

The original case purchases selected used/new machines outright; it does not lease those same machines in monthly OPEX. Power, air and inspection setup are separate capital uses. Actual installed quotes and part specifications can change every amount.

Original US-dollar opening cash uses; assumptions, not a national startup range or supplier quotes
Cash use$
CAPEX: Selected machining centre200,000
CAPEX: Selected lathe120,000
CAPEX: Inspection equipment30,000
CAPEX: Air/handling equipment25,000
CAPEX: Premises/power fit-out45,000
Pre-opening: Commissioning, calibration and training12,000
Pre-opening: Local plans/professional setup8,000
Refundable deposit / tied-up cash8,000
Opening stock / initial working inputs15,000
Reserve: 2 selected fixed-cost months54,800
Selected opening cash total517,800

CAPEX totals $420,000, pre-opening expense $20,000 and working cash $77,800. The deposit and opening stock tie up cash; they are not added again as monthly rent or consumed inputs. The reserve is a chosen fixed-cost buffer, not proof of full funding. Obtain actual installed/tax-inclusive quotes and dated opening payments.

Monthly fixed and variable OPEX

Two 160-hour machinist roles receive a$14,000 loaded budget, with 75% of 320 hours selected as productive. Estimating/office is separate. Tool wear and external finishing are per-job costs; base maintenance is a standing commitment, not an extra charge for the same consumables.

Original monthly fixed cash budget; $
Commitment$ per month
Two machinists: loaded 160-hour rosters14,000
Estimating/office: loaded budget4,000
Lease/common charges4,000
Base utilities1,400
Insurance900
Maintenance commitment1,500
CAD/CAM/software600
Marketing500
Admin500
Total selected fixed cash27,400
Original cash economics per completed standard job; $, excluding sales tax; unrounded unit allocations
Item$ per unit
Net collected selling value1,800
Metal including selected scrap allowance400
Tool wear/cutting consumables150
External finishing/heat service150
Percentage-only fee allocation (1%)18
Contribution before scheduled payroll/fixed OPEX1,082

The percentage fee is an aggregate allocation, with no fixed per-payment charge assumed. Unit contribution is not owner income: the full listed monthly roster and overhead still need coverage.

Capacity, break-even and a lower-sales case

A comparable job consumes six productive operator hours and eight usable spindle-hours. Operator time permits 40 jobs;300 spindle-hours permit 37 whole jobs. Plan 32. Unattended machining, setups, inspection and changeovers need a real sequence rather than adding both resource limits together.

For this fixed mix and commitment, whole-unit cash break-even is 26 completed standard jobs per month: ($27,400) ÷ $1,082, rounded up. The aggregate capacity is 37 units; it does not establish customer demand or a workable daily sequence.

Original monthly sensitivity; same price, unit costs and selected commitments
Paid unitsNet sales $Selected result $
2239,600-3,596
2646,800732
32 (planned)57,6007,224
3766,60012,634

At 22 jobs the staffed premises and maintenance commitment remain. The retained guide's prototype/batch ranking is a separate resource-allocation case; do not import its unit price as this standard-job specification.

Practical KPI definitions

Track contribution per constrained spindle-hour, setup versus run hours, first-pass good output and quote-versus-actual metal/tool usage. A high invoice value alone cannot rank jobs when their constrained-hour requirements differ.

No depreciation, finance, income tax or machine replacement is counted in selected operating cash. Actual material deposits, inspection acceptance and receivables require a job cash calendar.

Method context: SBA business planning. All case prices, wages, cost ratios, reserve and capacity inputs above are original planning assumptions.

What the selected product covers

The official Small Batch Manufacturing Service Financial Model listing describes an editable five-year Excel model. Product launch month controls revenue timing, and produced units multiply annual prices. Shipments equal production in the stated configuration; no inventory bridge is included. Outputs include profit and loss, monthly and annual cash projections, break-even/return indicators and dashboard charts.

Use the actual routing before loading product volume

Our original repeat job earns $300 over 18.67 bottleneck hours; a different prototype earns $500 over 16. Ranking by total job revenue alone reverses that result, and both jobs together exceed the 22 available hours.

Use actual routings and accepted specifications before loading product volumes. Keep acceptance, work in progress and material cash reconciled with the produced-unit forecast. The Machine Shop planning guide develops the original worked case.

Planning guide

Read the supporting planning guide

Machine Shop Financial Planning Guide